INSTALLATION
Installing and connecting Autel chargers
Practical steps for installers: from supply cable to the connection with your own OCPP platform.
Connecting an Autel charger to your OCPP platform
How to link an Autel unit to the CPMS of your choice, and what we need from you to do it.
Read the steps →Installing an AC charger: steps for the installer
Preparation, cable choice, protection and handover of an Autel AC unit up to 22 kW.
Read the steps →Installing a DC fast charger: preparation and wiring
What to arrange up front: grid power, foundation, cooling and inspection.
Read the steps →Setting up load balancing on an Autel installation
Several charge points on an existing connection, without tripping the main fuse.
Read the steps →Installer page per country
Standards, inspection, certification and connection steps for electricians and companies, per country of installation.
