Skip to main content
B2B

Blulinc distributes Autel across Europe, exclusively to professional partners: wholesalers, installers, resellers and webshops.

FAST CHARGING

Fast charging in the Benelux, from 50 kW to 1.4 MW

Looking to buy a fast charger, install a DC charger or build a complete charging hub? Blulinc distributes the full Autel DC range in the Benelux, from a compact 50 kW unit to a 1.4 MW hub, and configures every unit on the platform you choose.

Request a quote →Charging advice for your hubDescribe your project and get a proposal with units, quantities, payment terminals and options.
TRUCK DEPOTSTruck depot with DS600 and 10x DT300Complete setup with power sharing, cables and price per point.Go to the truck page →
Highway charging plaza with fast chargers at duskDC
A plaza with multiple fast chargers: power sharing, throughput and payment drive the design.

Buying a fast charger: which power for which car park

Power follows from the type of car park and how long a vehicle stays. This is the split we use in practice.

50 kW

Retail, hospitality, visitor parking

One compact unit with two charge points, wall mounted, on a pedestal or on wheels. Ideal where visitors stay 30 to 60 minutes.

160 to 240 kW

Semi-public parking, business site

One cabinet with two to four charge points, for cars and vans that need to move on quickly.

480 kW and above

Public fast charging hub

One power cabinet that shares power across several dispensers. You expand with dispensers, not with new grid connections.

Up to 1.4 MW

Truck and bus depots, flash charging

Megawatt charging for heavy transport, with CCS2 for trucks and MCS where available.

The 640 kW DC HiPower

Autel presents the MaxiCharger DC HiPower up to 640 kW: ultra-fast charging for the most demanding fleets and truck stops.

Installing a DC charger: from grid connection to handover

Installing a DC charger hinges on the grid connection and cable sizing. This is the order we work in.

01

Set power and connection

We check the required power against your available kVA. If it falls short, we share power with load balancing or a cabinet with dispensers.

02

Size cables and protection

Cable section, length and protection to NEN 1010 or the Belgian AREI. DC adds up fast, so this happens before any groundwork.

03

Foundation and placement

Wall mount, pedestal or foundation, with routes for cables and cooling. With dispensers we account for the distance to the cabinet.

04

Configuration and handover

We configure the unit on your OCPP platform, test every charge session and hand over with a report. Monitoring is optional.

Building a hub on public and semi-public car parks

Building a hub means planning for growth. These three choices decide how cheaply you can expand later. Charging plaza →

Cabinet with dispensers instead of standalone units

One power cabinet feeds several dispensers. Adding a charge point means adding a dispenser, not applying for a new grid connection.

Payment on site and Eichrecht

Public car parks need a payment terminal. Payter P66 or Apollo are integrated, and where the law requires it we supply versions with MID metering and Eichrecht.

Semi-public with access control

Staff and visitors on the same infrastructure, with tariffs and access per group through your platform and charge cards.

Truck depot with charging cabinets and dispensers at nightDepot
Depot charging for heavy transport: power cabinets with dispensers, scheduled around the driving rota.

On any platform via OCPP

Autel fast chargers speak OCPP 1.6J and, where available, OCPP 2.0.1. You give us the OCPP url of your platform, we configure the unit. No mandatory subscription with us, no lock-in.

Read more about OCPP freedom →

Frequently asked questions about fast charging

What does a fast charger cost?

Price depends on power, the number of charge points, the payment terminal and cable management. Once signed in, partners see their own price per model and per option.

How much power does my car park need?

Start from dwell time. An hour on site means 50 kW is enough. Leaving within 20 minutes means 160 kW or more.

Can I expand later?

Yes. With a cabinet and dispensers you add a dispenser within the available power, without a new grid connection.

Does an Autel fast charger work on my platform?

Yes, via OCPP. We configure the unit on your platform's OCPP url and test the first sessions with you.

What does a charging hub cost?

Every cost item, from the charger to handover, with three typical projects. A page you can forward to your client.

View the costs →