Charging explained, without jargon
Short articles for installers and decision makers who do not yet work with charging infrastructure every day.

AC or DC charging, which do you pick?
The key difference in two minutes, with a simple rule of thumb per situation.
Read this article →
AC or DC for a company car park? A practical guide
Choose around the energy vehicles need during their parking time, not the highest rated power. Here is how to assess AC, DC or a combination for a company car park.
Read this article →
Becoming a charge point installer in Belgium
What you need to start with charge points, and the steps to take.
Read this article →
OCPP and charging platforms explained
Why an open protocol keeps your customer free, and what a platform actually does.
Read this article →
Connecting to any CPMS: OCPP url, proxy and cable sizing
For B2B partners: how to put an Autel unit on your own platform, what a proxy url does and how to size the cable correctly.
Read this article →
NEN 1010 for EV chargers: key points for installers
A practical checklist for protection, residual current, diversity and handover of AC and DC charging infrastructure.
Read this article →
Cable sizing for EV chargers and fast chargers
Determine cable size, protection and voltage drop from power, distance, installation method and environment.
Read this article →
OCPP by Autel model: connecting to your own CPMS
Which Autel chargers connect over OCPP, the details required and what to verify for every project.
Read this article →
Installation, commissioning and warranty FAQ
Answers to common questions about installation, inspection, networking, handover, faults and RMA.
Read this article →