From 22 kW to 1.4 MW
AC chargers, DC fast chargers and distributed systems from one range.
Blulinc distributes Autel across Europe, exclusively to professional partners: wholesalers, installers, resellers and webshops.
Consumer? Buy through one of our partners.From a 22 kW wallbox to a 1.4 MW charging hub. We supply professionals across the EU, from stock within 7 to 10 days.
AUTELFrom compact AC wall units to 1.2 MW flash charging for heavy trucks. Every model with datasheet, stock status and a tailored quote.
AC chargingA car is full in about 6 hours, one car at a time.
Compact 22 kW AC wallbox for home and office.
Lead time 7-10 working days
AC chargingA car is full in about 6 hours, one car at a time.
Flexible 22 kW AC charger with Smart Junction Box.
Lead time 7-10 working days
AC chargingA car is full in about 6 hours, two cars at the same time.
Dual AC charger, 2 x 22 kW, with 8 inch touchscreen.
Lead time 7-10 working days
AC chargingA car is full in about 6 hours, two cars at the same time.
Public AC pedestal, 2 x 22 kW, AFIR compliant.
Lead time 7-10 working days
DC fast chargingA car goes from 20 to 80 percent in about 40 minutes, two cars at the same time.
50 kW DC fast charger for wall mounting, pedestal or mobile use on wheels.
Lead time 8-12 weeks
DC fast chargingA car goes from 20 to 80 percent in about 25 minutes, 2 cars at a time.
Modular DC fast charger up to 240 kW for busy sites.
Lead time 8-12 weeks
DC fast chargingA car goes from 20 to 80 percent in about 20 minutes, 4 cars at the same time.
Modular DC fast charger up to 480 kW, fanless air cooling.
Lead time 8-12 weeks
DC fast chargingA car goes from 20 to 80 percent in about 20 minutes, 4 cars at the same time.
Modular DC fast charger up to 480 kW, liquid-cooled for heavy use.
Lead time 8-12 weeks
DC distributedA car goes from 20 to 80 percent in about 20 minutes, 4 cars at the same time.
480 kW power cabinet for up to 8 charge points.
Lead time 8-12 weeks
DC distributedA car goes from 20 to 80 percent in about 20 minutes, 8 cars at the same time.
960 kW power cabinet, MCS and CCS combinable.
Lead time 8-12 weeks
DC distributedA car goes from 20 to 80 percent in about 20 minutes, 12 cars at the same time.
1440 kW power cabinet for large charging hubs.
Lead time 8-12 weeks
DC distributedA car goes from 20 to 80 percent in about 20 minutes, two cars at the same time.
Air cooled dispenser up to 400 kW per charge point.
Lead time 8-12 weeks
DC distributedA car goes from 20 to 80 percent in about 20 minutes, two cars at the same time.
Liquid cooled dispenser up to 480 kW per charge point.
Lead time 8-12 weeks
DC distributedA car goes from 20 to 80 percent in about 20 minutes, two cars at the same time.
Megawatt dispenser up to 1.2 MW for heavy duty vehicles.
Lead time 8-12 weeksCharging at home, with split billing.
SME / BUSINESSCharging for staff and visitors.
FLEETDC for vehicles on the road daily.
PUBLIC / GOVERNMENTFast charging on public sites.
TRUCK / HEAVY DUTYUp to 1.2 MW for heavy freight and charging hubs.
AC chargers, DC fast chargers and distributed systems from one range.
Delivery from our own stock for AC units, backorder for large DC.
No vendor lock-in. We configure on your client's CPMS.
Pick where the charger goes. We show the right units straight away, no technical knowledge needed.
One or two cars charging overnight or during the working day.
See the AC chargers →AC CHARGINGSeveral cars a day, with smart sharing of the available power.
See AC Ultra and pedestals →DC FAST CHARGINGA car back on the road after 20 to 40 minutes.
See the DC fast chargers →Fill in the quote helper or email us. You do not need any technical detail yet.
We pick the right unit with you and you get a quote with your partner price.
AC units are in stock and arrive in 7 to 10 days. Other units follow in 8 to 12 weeks.
You or our installation partner places the charger. We configure it on your OCPP url and monitor it with you.
Send us the project and we will put it together, usually within one working day.